A first multi-pitch kit

A multi-pitch route goes up more than one rope length, so the climbers stop and build a belay on the wall before the next pitch. The kit is mostly what you already use at the crag, with a few additions. Learn the systems with an instructor before you try them on a real route.
For each climber
- A harness with gear loops you can reach
- Climbing shoes comfortable enough to wear for hours
- A helmet: on a wall, stones and gear fall from above
- A belay device that can belay from above
- A chalk bag on a belt
For the pair
- One 60 m or 70 m single rope, long enough for the descent
- Quickdraws and slings for the pitches
- Locking carabiners for each belay
- A small daypack with water, a layer and a headlamp
Read the route description for the longest pitch and the way down. If the descent is by rappel, the doubled rope must reach the next anchor, so a 70 m rope may be the only choice.
What stays at home
Leave the big water bottle and the spare shoes. On the wall every gram is lifted by hand, and a light pack with a shell and a snack is enough for a half-day route. Keep a headlamp, though: routes take longer than planned, and the walk off is often done in the dark. Agree with your partner who carries the pack on each pitch before you leave the ground.


Comments (0)
No comments yet. Be the first!